ndc

322 days LTI free Drilling Operations
NDC has successfully achieved 322 days LTI free Operations in 2008; which is the highest record NDC ever achieved. During the period total of 8.5 million man-hours worked, covering all Offshore and Onshore Operations. 

Wireline Services

From initial drilling to well management and workover operations, NDC provides a full range of services to the oil industry. A specialized engineering services division was established in 2004 to enhance our competitiveness in oilfield services.

Wireline operations enable downhole tools and equipment to be run down the wellbore and operated using a wireline mounted at the surface. Downhole wireline tools can be used to gather data, maintenance of downhole equipment, enhance the wellbore and control flow and for fishing operations. As these activities are performed under well pressure, NDC uses wellhead pressure control equipment that comply with industry standards.